Sync Trends
- 06 Feb 2024
- 印刷する
- PDF
Sync Trends
- 更新日 06 Feb 2024
- 印刷する
- PDF
The content is currently unavailable in Ja - 日本語. You are viewing the default English version.
記事の要約
この要約は役に立ちましたか?
ご意見ありがとうございます
Purpose: Use the Sync option to synchronize the time spans of all trends in a MultiTrend.
Task: Open a MultiTrend. In one of the Trends, zoom into a specific period of time. Right-click the plot area of the same trend and select Sync.
Steps:
In a MultiTrend, zoom in to a specific period of time in one of the Trends.
Right-click the plot area of the same Trend and select Sync. This will synchronize all Trends to the same time span.
この記事は役に立ちましたか?